Select Page

Thames Water said that this section of road is so busy even weekend work causes big disruption. Keyhole Tech were called out to help locate and excavate for repair to the 8 inch main, 9 days were set aside by Thames Water for the entire job but only 1 shift was required for the leak to be located and repaired benefiting the users of the busy A12. A spokesman for Thames Water said ‘this is definitely the way forward, returning the road back to use quickly and safely’.